Lochluichart Wind Farm Extension II Further Environmental Information – April 2022
Volume 1 – Written Statement
Volume 2 – Figures
- Figure 2.0 Bat Survey Plan 2021
- Figure 2.1 Extended Habitat Survey Results
- Figure 3.0 Context Wind Farms
- Figure 3.1 Raptor Study Areas
- Figure 3.2 Diver Study Areas
- Figure 3.3 Raptor Survey Area 2021 and 2022
- Figure 3.6a Vantage Point Survey Results Feb 2021 to Aug 2021 inclusive
- Figure 3.6b Vantage Point Survey Results Sep 2021 to Feb 2022 inclusive
- Figure 3.7 Moorland Breeding Bird Survey Results 2015 and 2021
- Figure 3.8 Black Grouse Survey and Results
Appendices
- Appendix 1.A Consultation
- Appendix 1.B Design and Access Statement
- Appendix 2.A Ecology
- Appendix 3.A Ornithology
- Appendix 5.A Key LVIA Viewpoints
- Appendix 5.B A835 Sequence Viewpoints
Section 37 Grid Connection Application to connect Lochluichart Wind Farm Extension II – January 2022
Volume 1 – Written Statement
Volume 2 – Figures
Appendices
- Appendix 1 – EIA Screening Opinion ECU
- Appendix 2 – Garve and District Community Council Presentation
- Appendix 3a – NatureScot Consultation Response
- Appendix 3b – SEPA Consultation Response
- Appendix 3c – HES Consultation Response
- Appendix 4 – Ecological Impact Assessment Report
- Appendix 5a – Breeding Bird Survey Report
- Appendix 6a – LVA – Figures 1-9
- Appendix 6b – LVA Figure 10a
- Appendix 6c – LVA Figure 10b
- Appendix 6d – LVA Figure 11
- Appendix 6e – LVA Figure 12
- Appendix 7 – Flooding and Erosion Assessment Rev 1
- Appendix 7a – Appendix A Proposed 33kv Route
- Appendix 7b – Appendix B SEPA Flood Maps
- Appendix 8 – Woodland Impact Assessment June 2021
- Appendix 9 – Indicative Route Profiles
- Appendix 9a – Route Design Layout p1
- Appendix 9b – Route Design Layout p2
- Appendix 9c – Route Design Layout p3
- Appendix 9d – Route Design Layout p4
- Appendix 9e – Route Design Layout p5
- Appendix 9f – Route Design Layout p6
Application Documents – June 2021
Supporting Documents
Volume 1 – Written Statement
- Chapter 1 Introduction
- Chapter 2 EIA Process
- Chapter 3 Description of the Proposed Development
- Chapter 4 Policy Context
- Chapter 5 Climate Change
- Chapter 6 Socio Economic
- Chapter 7 Noise
- Chapter 8 LVIA
- Chapter 9 Cultural Heritage
- Chapter 10 Ecology
- Chapter 11 Ornithology
- Chapter 12 Hydrology, Hydrogeology, Geology and Peat
- Chapter 13 Shadow Flicker & Safety
- Chapter 14 Infrastructure
- Chapter 15 Forestry
- EIA Report Contributors
Volume 2 – Figures
- Figure List
- Figure 1.0 Site Boundary
- Figure 1.1 Site Location
- Figure 3.1 Site Layout
- Figure 3.2 Typical Wind Turbine Design
- Figure 3.3 Typical Crane Hardstanding
- Figure 3.4 Typical Construction Compound
- Figure 3.5 Typical Control Building Compound and Battery Storage Facility
- Figure 3.6 Typical Turbine Foundation
- Figure 3.7 Indicative Programme for Construction Activities
- Figure 3.8 Typical Road Construction
- Figure 3.9 Typical Bridge
- Figure 3.10 Typical Culvert
- Figure 3.11 Typical Cable Trench Detail
- Figure 3.12 Indicative Grid Connection Route
- Figure 9.0 Known Heritage Assets in the Inner Study Area
- Figure 9.1 Heritage Assets in the Outer Study Area
- Figure 10.0 Statutory Designated Sites
- Figure 10.1 Phase 1 Habitat Plan
- Figure 10.2 NVC Habitat Plan
- Figure 10.3 Bat Survey Plan
- Figure 10.4 Protected Mammal Survey Methodologies
- Figure 10.5 Protected Mammal Survey Results
- Figure 11.0 Statutory Designated Sites
- Figure 11.1 Vantage Point Surveys
- Figure 11.2 Vantage Point Survey Results
- Figure 11.3 Breeding Bird Survey Plan
- Figure 11.4 Woodland Grouse Survey and Results
- Figure 11.5 Breeding Raptor Survey and Results
- Figure 15.0 Forestry Study Area
- Figure 15.1 Baseline species
- Figure 15.2 Felling plan
- Figure 15.3 Restock plan
Volume 3 – LVIA Figures
GIS
- Fig8-1_StudyArea
- Fig8-2_LCA
- Fig8-3_Designations
- Fig8-4-WLA
- Fig8-5_VR
- Fig8-6a_ZTV_BT_40km
- Fig8-6b_ZTV_BT_15km
- Fig8-7a_ZTV_HH_40km
- Fig8-7b_ZTV_HH_15km
- Fig8-8a_HZTV_40km
- Fig8-8b_HZTV_15km
- Fig8-9_ZTV_LCA_15km
- Fig8-10_ZTV_Designations_15km
- Fig8-11_ZTV_WLA_15km
- Fig8-12_ZTV_VR_15km
- Fig8-13_ZTV_Design_WLA_VR_A0
- Fig8-14_CWF
- Fig8-15_CZTV_Corriemoillie_LLX
- Fig8-16_CZTV_Kirkan
- Fig8-17_CZTV_Novar
- Fig8-18_CZTV_CoireNaCoiche_BeinnTharsuinn
- Fig8-19_CZTV_Fairburn_Auchmore
- Fig8-20_CZTV_Strathrory
- Fig8-21_CZTV_MeallBuidhe_Braelangwell
NatureScot
- VP1_Aultguish_Inn_Fig8-22
- VP2_A835_Black_Water_Bidge_Fig8-23
- VP3_A835_Garve_Bidge_Fig8-24
- VP4_Old_Drovers_Route_Corriemoillie_Fig8-25
- VP5_Ben_Wyvis_(Glas_Leathad_Mor)_Fig8-26
- VP6_Summit_of_An_Coileachan_Fig8-27
- VP7_Sgurr_Mor_Fig8-28
- VP8_Beinn_a_Chaisteil_Fig8-29
- VP9_Avenue_of_Fairburn_Estate_Fig8-30
- VP10_Sgurr_a_Mhuillinn_Fig8-31
- VP11_Sgurr_a_Choire_Ghlais_Fig8-32
- VP12_Beinn_Dearg_Fig8-33
- VP13_Am_Faochagach_Fig8-34
The Highland Council
- VP1_Aultguish_Inn_Fig8-48
- VP2_A835_Black_Water_Bidge_Fig8-49
- VP3_A835_Garve_Bidge_Fig8-50
- VP4_Old_Drovers_Route_Corriemoillie_Fig8-51
- VP5_Ben_Wyvis_(Glas_Leathad_Mor)_Fig8-52
- VP6_Summit_of_An_Coileachan_Fig8-53
- VP7_Sgurr_Mor_Fig8-54
- VP8_Beinn_a_Chaisteil_Fig8-55
- VP9_Avenue_of_Fairburn_EstateFig8-56
- VP10_Sgurr_a_Mhuillinn_Fig8-57
- VP11_Sgurr_a_Choire_Ghlais_Fig8-58
- VP12_Beinn_Dearg_Fig8-59
THC/NatureScot A835 Route Analysis
Appendices
- Appendix List
- Appendix 2.A Highland Council Scoping Response
- Appendix 5.A Carbon Savings calculation
- Appendix 8.A LVIA Methodology
- Appendix 10.A Habitats & Vegetation
- Appendix 10.B Desk Study & Protected Mammals
- Appendix 10.C Consultation
- Appendix 13.A Engineering Review
Consultation – December 2020
Scoping Report – October 2020
Figure 5.1 Ecological Designated Sites
Figure 5.2 Phase 1 Habitat Plan
Figure 5.3 National Vegetation Classification Survey
Figure 5.4 Bat Survey Plan
Figure 5.5 Protected Mammal Survey
Figure 6.1 Ornithological Designated Sites
Figure 6.2 Vantage Point Flight Activity Survey Area
Figure 6.3 Ornithological Breeding Bird Survey Plan
Figure 6.4 Ornithological Woodland Grouse Survey Area
Figure 6.5 Breeding Raptor Survey Area
Figure 6.6 Corriemollie Wind Farm Study Areas
Figure 7.1 Site Location
Figure 7.2 Cumulative Wind Farms
Figure 7.3 Blade Tip ZTV & Landscape Character
Figure 7.4 Blade Tip ZTV & Wild Land Areas_opt
Figure 7.5 Blade Tip ZTV & Landscape Designations
Figure 7.6 Blade Tip ZTV & Viewpoint locations
Figure 7.7 Blade Tip ZTV & Visual Receptors
Figure 7.8 Comparative Blade Tip ZTV with Lochluichart, Extension & Corriemoillie Wind Farms
Figure 7.9 Comparative Blade Tip ZTV with Consented Lochluichart Extension II
Supplementary Information Documents – November 2019
Supplementary Information has now been submitted to The Highland Council and statutory consultees. You can find all of the relevant documents below:
Volume 1 – Written Statement SI
Volume 2 – Figures SI
Figure 2.1 Iterative Design
Figure 3.1 Site Layout
Figure 3.5 Typical Control Building Compound and Battery Storage Facility
Figure 6.1 Recreational Routes & Tourist Attractions
Figure 7.1 RTC Assessment
Figure 8.1 Cumulative Screening Plot
Figure 8.2 Noise Contour Plot
Figure 9.11 Cumulative Wind Farms
Figure 9.12 Cumulative ZTV with Lochluichart, Lochluichart Extension and Corriemoillie
Figure 9.21 abcde Viewpoint 1 A835 Aultguish Inn
Figure 9.21c Viewpoint 1 A835 Aultguish Inn
Figure 9.22 abcd Viewpoint 2 A835 Black Bridge
Figure 9.22b Viewpoint 2 A835 Black Bridge
Figure 9.23b Viewpoint 3 A835, Garve Bridge
Figure 9.24c Viewpoint 4 Old Drovers Route, Corriemoillie
Figure 9.25 acfg Viewpoint 5 Ben Wyvis (Ghlas Leathad Mor)
Figure 9.25c Viewpoint 5 Ben Wyvis (Ghlas Leathad Mor)
Figure 9.26c Viewpoint 6 An Coileachan
Figure 9.27c Viewpoint 7 Sgurr Mor
Figure 9.28 acfg Viewpoint 8 Beinn a Chaisteil
Figure 9.28c Viewpoint 8 Beinn a Chaisteil
Figure 9.29c Viewpoint 9 Avenue of Fairburn Estate
Figure 9.30c Viewpoint 10 Sgurr a Mhuillinn
Figure 9.31c Viewpoint 11 Sgurr a Choire Ghlais
Figure 9.32c Viewpoint 12 Beinn Dearg
Figure 9.33 Viewpoint 1 A835 Aultguish Inn
Figure 9.34 Viewpoint 2 A835 Black Bridge
Figure 9.37 Viewpoint 3 Ben Wyvis (Glas Leathad Mor)
Figure 9.40 Viewpoint 4 Beinn a Chaisteil
Figure 9.45 Kirkan Wind Farm – Cumulative ZTV
Figure 10.0 Heritage Assets in the Inner Study
Figure 10.1 Cultural Heritage Constraint Area
Figure 11.0 Statutory Designated Sites
Figure 11.1 Phase 1 Habitat Plan
Figure 11.2 NVC Habitat Plan
Figure 11.3 Bat Survey Plan
Figure 11.4 Protected Mammal Survey Methodologies
Figure 11.5 Protected Mammal Survey Results
Figure 12.0 Statutory Designated Sites
Figure 12.1 Vantage Point Surveys
Figure 12.2 Vantage Point Survey Results
Figure 12.3 Breeding Bird Survey Plan
Figure 12.4 Woodland Grouse Survey and ResultsFigure 12.5 Breeding Raptor Survey and Results
Volume 3 – Appendices SI
Appendix 1.A SNH response
Appendix 1.B SEPA Response
Appendix 1.C HIAL response
Appendix 1.D Scotways Response
Appendix 3.A MoD response
Appendix 3.B Decommissioning Bond wording
Appendix 5.A Carbon Calculator
Appendix 8.A Wind Turbine Noise Emission Data
Appendix 13.A Outline Water Construction Quality Management Plan
Appendix 13.B Outline Peat Management Plan
Appendix 13.C Peat Slide Risk Assessment
Appendix 15.A Inverness Airport HIAL LoS Report
Appendix 15.B HIAL Email
Appendix 16.A Forestry response
Application Documents – April 2019
The Environmental Impact Assessment has now been submitted to The Highland Council and statutory consultees. You can find all of the relevant documents below:
Volume 1 – Written Statement
Volume 4 – Appendices
Supporting Documents:
Scoping Report
The Scoping Report for Lochluichart Wind Farm Extension II has now been submitted to Scottish Ministers and the various statutory consultees, including The Highland Council. To view the Scoping Report and associated documents, please click the links below:
Figures 1 – 6 (Ecology)
Figures 7 – 14 (Landscape and Visual Impact)*
*These files have been reduced in size in order to enable ease of download. If you’d like a copy of the larger original files, please get in touch and we’ll arrange to send them to you.
Community Open Day Information Boards – October 2017
Community Open Day Information boards.
Visual wireframe boards:
Board 1, Board 2, Board 3, Board 4, Board 5, Board 6, Board 7, Board 8
Community Open Day Information Boards – April 2018
Community Open Day information boards
Visual wireframe boards here.
Newsletters
The newsletters are available here:
LXX Newsletter 1 – September 2017
LXX Newsletter 2 – March 2018
LXX Newsletter 3 – November 2020
Lochluichart Wind Farm Extension II Further Environmental Information – April 2022
Volume 1 – Written Statement
Volume 2 – Figures
- Figure 2.0 Bat Survey Plan 2021
- Figure 2.1 Extended Habitat Survey Results
- Figure 3.0 Context Wind Farms
- Figure 3.1 Raptor Study Areas
- Figure 3.2 Diver Study Areas
- Figure 3.3 Raptor Survey Area 2021 and 2022
- Figure 3.6a Vantage Point Survey Results Feb 2021 to Aug 2021 inclusive
- Figure 3.6b Vantage Point Survey Results Sep 2021 to Feb 2022 inclusive
- Figure 3.7 Moorland Breeding Bird Survey Results 2015 and 2021
- Figure 3.8 Black Grouse Survey and Results
Appendices
- Appendix 1.A Consultation
- Appendix 1.B Design and Access Statement
- Appendix 2.A Ecology
- Appendix 3.A Ornithology
- Appendix 5.A Key LVIA Viewpoints
- Appendix 5.B A835 Sequence Viewpoints
Section 37 Grid Connection Application to connect Lochluichart Wind Farm Extension II – January 2022
Volume 1 – Written Statement
Volume 2 – Figures
Appendices
- Appendix 1 – EIA Screening Opinion ECU
- Appendix 2 – Garve and District Community Council Presentation
- Appendix 3a – NatureScot Consultation Response
- Appendix 3b – SEPA Consultation Response
- Appendix 3c – HES Consultation Response
- Appendix 4 – Ecological Impact Assessment Report
- Appendix 5a – Breeding Bird Survey Report
- Appendix 6a – LVA – Figures 1-9
- Appendix 6b – LVA Figure 10a
- Appendix 6c – LVA Figure 10b
- Appendix 6d – LVA Figure 11
- Appendix 6e – LVA Figure 12
- Appendix 7 – Flooding and Erosion Assessment Rev 1
- Appendix 7a – Appendix A Proposed 33kv Route
- Appendix 7b – Appendix B SEPA Flood Maps
- Appendix 8 – Woodland Impact Assessment June 2021
- Appendix 9 – Indicative Route Profiles
- Appendix 9a – Route Design Layout p1
- Appendix 9b – Route Design Layout p2
- Appendix 9c – Route Design Layout p3
- Appendix 9d – Route Design Layout p4
- Appendix 9e – Route Design Layout p5
- Appendix 9f – Route Design Layout p6
Application Documents – June 2021
Supporting Documents
Volume 1 – Written Statement
- Chapter 1 Introduction
- Chapter 2 EIA Process
- Chapter 3 Description of the Proposed Development
- Chapter 4 Policy Context
- Chapter 5 Climate Change
- Chapter 6 Socio Economic
- Chapter 7 Noise
- Chapter 8 LVIA
- Chapter 9 Cultural Heritage
- Chapter 10 Ecology
- Chapter 11 Ornithology
- Chapter 12 Hydrology, Hydrogeology, Geology and Peat
- Chapter 13 Shadow Flicker & Safety
- Chapter 14 Infrastructure
- Chapter 15 Forestry
- EIA Report Contributors
Volume 2 – Figures
- Figure List
- Figure 1.0 Site Boundary
- Figure 1.1 Site Location
- Figure 3.1 Site Layout
- Figure 3.2 Typical Wind Turbine Design
- Figure 3.3 Typical Crane Hardstanding
- Figure 3.4 Typical Construction Compound
- Figure 3.5 Typical Control Building Compound and Battery Storage Facility
- Figure 3.6 Typical Turbine Foundation
- Figure 3.7 Indicative Programme for Construction Activities
- Figure 3.8 Typical Road Construction
- Figure 3.9 Typical Bridge
- Figure 3.10 Typical Culvert
- Figure 3.11 Typical Cable Trench Detail
- Figure 3.12 Indicative Grid Connection Route
- Figure 9.0 Known Heritage Assets in the Inner Study Area
- Figure 9.1 Heritage Assets in the Outer Study Area
- Figure 10.0 Statutory Designated Sites
- Figure 10.1 Phase 1 Habitat Plan
- Figure 10.2 NVC Habitat Plan
- Figure 10.3 Bat Survey Plan
- Figure 10.4 Protected Mammal Survey Methodologies
- Figure 10.5 Protected Mammal Survey Results
- Figure 11.0 Statutory Designated Sites
- Figure 11.1 Vantage Point Surveys
- Figure 11.2 Vantage Point Survey Results
- Figure 11.3 Breeding Bird Survey Plan
- Figure 11.4 Woodland Grouse Survey and Results
- Figure 11.5 Breeding Raptor Survey and Results
- Figure 15.0 Forestry Study Area
- Figure 15.1 Baseline species
- Figure 15.2 Felling plan
- Figure 15.3 Restock plan
Volume 3 – LVIA Figures
GIS
- Fig8-1_StudyArea
- Fig8-2_LCA
- Fig8-3_Designations
- Fig8-4-WLA
- Fig8-5_VR
- Fig8-6a_ZTV_BT_40km
- Fig8-6b_ZTV_BT_15km
- Fig8-7a_ZTV_HH_40km
- Fig8-7b_ZTV_HH_15km
- Fig8-8a_HZTV_40km
- Fig8-8b_HZTV_15km
- Fig8-9_ZTV_LCA_15km
- Fig8-10_ZTV_Designations_15km
- Fig8-11_ZTV_WLA_15km
- Fig8-12_ZTV_VR_15km
- Fig8-13_ZTV_Design_WLA_VR_A0
- Fig8-14_CWF
- Fig8-15_CZTV_Corriemoillie_LLX
- Fig8-16_CZTV_Kirkan
- Fig8-17_CZTV_Novar
- Fig8-18_CZTV_CoireNaCoiche_BeinnTharsuinn
- Fig8-19_CZTV_Fairburn_Auchmore
- Fig8-20_CZTV_Strathrory
- Fig8-21_CZTV_MeallBuidhe_Braelangwell
NatureScot
- VP1_Aultguish_Inn_Fig8-22
- VP2_A835_Black_Water_Bidge_Fig8-23
- VP3_A835_Garve_Bidge_Fig8-24
- VP4_Old_Drovers_Route_Corriemoillie_Fig8-25
- VP5_Ben_Wyvis_(Glas_Leathad_Mor)_Fig8-26
- VP6_Summit_of_An_Coileachan_Fig8-27
- VP7_Sgurr_Mor_Fig8-28
- VP8_Beinn_a_Chaisteil_Fig8-29
- VP9_Avenue_of_Fairburn_Estate_Fig8-30
- VP10_Sgurr_a_Mhuillinn_Fig8-31
- VP11_Sgurr_a_Choire_Ghlais_Fig8-32
- VP12_Beinn_Dearg_Fig8-33
- VP13_Am_Faochagach_Fig8-34
The Highland Council
- VP1_Aultguish_Inn_Fig8-48
- VP2_A835_Black_Water_Bidge_Fig8-49
- VP3_A835_Garve_Bidge_Fig8-50
- VP4_Old_Drovers_Route_Corriemoillie_Fig8-51
- VP5_Ben_Wyvis_(Glas_Leathad_Mor)_Fig8-52
- VP6_Summit_of_An_Coileachan_Fig8-53
- VP7_Sgurr_Mor_Fig8-54
- VP8_Beinn_a_Chaisteil_Fig8-55
- VP9_Avenue_of_Fairburn_EstateFig8-56
- VP10_Sgurr_a_Mhuillinn_Fig8-57
- VP11_Sgurr_a_Choire_Ghlais_Fig8-58
- VP12_Beinn_Dearg_Fig8-59
THC/NatureScot A835 Route Analysis
Appendices
- Appendix List
- Appendix 2.A Highland Council Scoping Response
- Appendix 5.A Carbon Savings calculation
- Appendix 8.A LVIA Methodology
- Appendix 10.A Habitats & Vegetation
- Appendix 10.B Desk Study & Protected Mammals
- Appendix 10.C Consultation
- Appendix 13.A Engineering Review
Consultation – December 2020
Scoping Report – October 2020
Figure 5.1 Ecological Designated Sites
Figure 5.2 Phase 1 Habitat Plan
Figure 5.3 National Vegetation Classification Survey
Figure 5.4 Bat Survey Plan
Figure 5.5 Protected Mammal Survey
Figure 6.1 Ornithological Designated Sites
Figure 6.2 Vantage Point Flight Activity Survey Area
Figure 6.3 Ornithological Breeding Bird Survey Plan
Figure 6.4 Ornithological Woodland Grouse Survey Area
Figure 6.5 Breeding Raptor Survey Area
Figure 6.6 Corriemollie Wind Farm Study Areas
Figure 7.1 Site Location
Figure 7.2 Cumulative Wind Farms
Figure 7.3 Blade Tip ZTV & Landscape Character
Figure 7.4 Blade Tip ZTV & Wild Land Areas_opt
Figure 7.5 Blade Tip ZTV & Landscape Designations
Figure 7.6 Blade Tip ZTV & Viewpoint locations
Figure 7.7 Blade Tip ZTV & Visual Receptors
Figure 7.8 Comparative Blade Tip ZTV with Lochluichart, Extension & Corriemoillie Wind Farms
Figure 7.9 Comparative Blade Tip ZTV with Consented Lochluichart Extension II
Supplementary Information Documents – November 2019
Supplementary Information has now been submitted to The Highland Council and statutory consultees. You can find all of the relevant documents below:
Volume 1 – Written Statement SI
Volume 2 – Figures SI
Figure 2.1 Iterative Design
Figure 3.1 Site Layout
Figure 3.5 Typical Control Building Compound and Battery Storage Facility
Figure 6.1 Recreational Routes & Tourist Attractions
Figure 7.1 RTC Assessment
Figure 8.1 Cumulative Screening Plot
Figure 8.2 Noise Contour Plot
Figure 9.11 Cumulative Wind Farms
Figure 9.12 Cumulative ZTV with Lochluichart, Lochluichart Extension and Corriemoillie
Figure 9.21 abcde Viewpoint 1 A835 Aultguish Inn
Figure 9.21c Viewpoint 1 A835 Aultguish Inn
Figure 9.22 abcd Viewpoint 2 A835 Black Bridge
Figure 9.22b Viewpoint 2 A835 Black Bridge
Figure 9.23b Viewpoint 3 A835, Garve Bridge
Figure 9.24c Viewpoint 4 Old Drovers Route, Corriemoillie
Figure 9.25 acfg Viewpoint 5 Ben Wyvis (Ghlas Leathad Mor)
Figure 9.25c Viewpoint 5 Ben Wyvis (Ghlas Leathad Mor)
Figure 9.26c Viewpoint 6 An Coileachan
Figure 9.27c Viewpoint 7 Sgurr Mor
Figure 9.28 acfg Viewpoint 8 Beinn a Chaisteil
Figure 9.28c Viewpoint 8 Beinn a Chaisteil
Figure 9.29c Viewpoint 9 Avenue of Fairburn Estate
Figure 9.30c Viewpoint 10 Sgurr a Mhuillinn
Figure 9.31c Viewpoint 11 Sgurr a Choire Ghlais
Figure 9.32c Viewpoint 12 Beinn Dearg
Figure 9.33 Viewpoint 1 A835 Aultguish Inn
Figure 9.34 Viewpoint 2 A835 Black Bridge
Figure 9.37 Viewpoint 3 Ben Wyvis (Glas Leathad Mor)
Figure 9.40 Viewpoint 4 Beinn a Chaisteil
Figure 9.45 Kirkan Wind Farm – Cumulative ZTV
Figure 10.0 Heritage Assets in the Inner Study
Figure 10.1 Cultural Heritage Constraint Area
Figure 11.0 Statutory Designated Sites
Figure 11.1 Phase 1 Habitat Plan
Figure 11.2 NVC Habitat Plan
Figure 11.3 Bat Survey Plan
Figure 11.4 Protected Mammal Survey Methodologies
Figure 11.5 Protected Mammal Survey Results
Figure 12.0 Statutory Designated Sites
Figure 12.1 Vantage Point Surveys
Figure 12.2 Vantage Point Survey Results
Figure 12.3 Breeding Bird Survey Plan
Figure 12.4 Woodland Grouse Survey and ResultsFigure 12.5 Breeding Raptor Survey and Results
Volume 3 – Appendices SI
Appendix 1.A SNH response
Appendix 1.B SEPA Response
Appendix 1.C HIAL response
Appendix 1.D Scotways Response
Appendix 3.A MoD response
Appendix 3.B Decommissioning Bond wording
Appendix 5.A Carbon Calculator
Appendix 8.A Wind Turbine Noise Emission Data
Appendix 13.A Outline Water Construction Quality Management Plan
Appendix 13.B Outline Peat Management Plan
Appendix 13.C Peat Slide Risk Assessment
Appendix 15.A Inverness Airport HIAL LoS Report
Appendix 15.B HIAL Email
Appendix 16.A Forestry response
Application Documents – April 2019
The Environmental Impact Assessment has now been submitted to The Highland Council and statutory consultees. You can find all of the relevant documents below:
Volume 1 – Written Statement
Volume 4 – Appendices
Supporting Documents:
Scoping Report
The Scoping Report for Lochluichart Wind Farm Extension II has now been submitted to Scottish Ministers and the various statutory consultees, including The Highland Council. To view the Scoping Report and associated documents, please click the links below:
Figures 1 – 6 (Ecology)
Figures 7 – 14 (Landscape and Visual Impact)*
*These files have been reduced in size in order to enable ease of download. If you’d like a copy of the larger original files, please get in touch and we’ll arrange to send them to you.
Community Open Day Information Boards – October 2017
Community Open Day Information boards.
Visual wireframe boards:
Board 1, Board 2, Board 3, Board 4, Board 5, Board 6, Board 7, Board 8
Community Open Day Information Boards – April 2018
Community Open Day information boards
Visual wireframe boards here.
Newsletters
The newsletters are available here:
LXX Newsletter 1 – September 2017
LXX Newsletter 2 – March 2018
LXX Newsletter 3 – November 2020